Swanlea Sixth Form
- Location: London, E1
- Client: London Borough of Tower Hamlets
- Date: July 2014 to April 2015
Construction of new extensions and internal refurbishment
Design and build new sixth form extension to Swanlea Academy including refurbishment to part of the old school. New boilers, calorifiers, forced ventilation and cooling, plus landscaping to external areas. Works were taken place in a busy occupied school and directly adjacent to a major cross rail project, meaning that the logistics of this project were particularly difficult because of the deep excavations happing at the same time on site. New CCTV and IP addressed security systems were installed and integrated into the existing systems, along with upgrades to the sites BMS. The building was cladded in Siberian Larch wood, the stairs were manufactured from European Oak, with the internal cladding in Birch faced ply, sprayed to comply with class “o” fire retardancy.