CYRIL JACKSON PRIMARY SCHOOL LONDON E14
The work comprised of the construction of a new entrance extension and office at the main South Building, including the following:-
a) Piled foundations with a reinforced concrete ring beam / ground floor structure.
b) Structural steel framework.
c) Timber framed external walls, insulated and covered with larch cladding externally.
d) Timber framed flat roof, insulated and covered with 3 layer high performance felt.
e) Double glazed aluminium entrance doors and windows.
f) Internal partitions, including new reception counter and glazed screen.
g) Internal doors, including forming new openings.
h) Floor finishes.
i) Decorations.
j) Internal office fittings.
k) Construction of accessible toilet.
l) Mechanical works.
m) Electrical works, including extending fire alarm, burglar alarm and access controls.
n) Underground drainage.
o) External landscaping.