Construction of two first floor rooms

Gantry & Canopies

The existing gantry and canopies were dismantled as part of the initial works.

Groundwork

Excavations to the lower ground was completed, followed by pile foundations and a concrete slab. Drainage infrastructure was also installed.

Structural Frame

Scaffolding was erected and the structural steelwork for the new construction was completed.

Upper Structure

First-floor construction, brickwork construction and roof construction were carried out.

External Envelope

Curtain walling was installed to form part of the building’s external envelope.

Internal Finishes

Electrical and air-conditioning works were undertaken, followed by drylining, plastering, decorations and carpeting internally.